Plan management

Top  Previous  Next

 

Purpose

With the help of the plan management 2 operations are supported., On the one hand, the access speed on the plans can be raised, on the other hand the plans which exist not really but on grounds of your system can be used for the processing, be generated. The plan management is used here with the pressure, with the new witness by plans and with the store of plans.

Method

The plan management is a data bank with 3 tables. Everybody 3 is summarised under a name. The first table contains a list of the defined sheet types with her typical qualities, e.g., of the resolution. The second table contains his expansion to every plan. In the third table the sheet head attributes are registered to every plan, so the attributes which are connected with this plan. This are, e.g., the local net to which the plan belongs, or the last pressure date.

Use

The plan management ""is manipulated with the function of the same name "plan management". It lets itself generate a plan management, open and fill. The files of the plan management are filed, provided that it does not concern an ODBC data bank, in the list GDS$DBB.

Implicitly the plan management is used by the functions New, Print and LoadArea.

Work routine plan management

1. Generate to a new plan management.

In order to generate a new plan management only their name is necessary. It is enough

Plan management CREATE meinePlanverwaltung

from. The plan management with all necessary tables is generated. She is neither active at that time, nor it is filled with data.

2. Open to this plan management

An existing plan management is activated. The plan management must exist, i.e. her tables must exist, however, still no data contained need.

Plan management OPEN meinePlanverwaltung

Further no plan management may be still open. In this case the opening of an other plan management misses. Then they only have to come too

Plan management CLOSE

the up to now activated plan management deactivate.

3. Put in of the required sheet types

The Befüllen of the plan management happens in two steps.

First the sheet types must be defined.

Then the plans must be put down.

Plan management LAYER 150 in 1000 0.01 150 1 R 9 0 W 0 HDF

Defining the sheet types happens with the untercommand LAYER. All information must be carried out as a parametre for this sheet type which defines all plans this sheet type.

4. Colts of the sheet types with plans

Should plans ""be inserted by hand" in the plan management, this happens with the order Unterkomando PLAN. Now here the data of a special plan are grasped.

Plan management PLAN meinPlan 3400000 5200000 3401000 5200500 150

5. Automatic gathering of available plans

The plans must not be put down individually by hand in the plan management. The function plan management offers ""an automatic with "ADDPLANS". For it a Layer of the plan management is given and the function ascertained all at the moment available plans in this Layer and puts down this in the plan management. The names of the plans are indicated if no plans are listed a mistake has occurred.

Plan management ADDPLANS HDF