Order of the field of work

Top  Previous  Next

Overview of loaded plans

About the menu point Verwalten|Pläne|Schalten... if you can get an overview about the loaded plans. Switched on plans are provided with a hook (from the objects of the switched on plans can be selected.). The name of the open plan is deposited blue.

In this dialogue plans can be switched on and switched off.

At the same time the suitable plans are selected by clicking the plan symbol in each case.

image5_31

Verwalten|Pläne|Schalten...

Which plan is just opened, however, lets itself also very simply in the status line (SB:Standard; ordinarily in the lower edge of the graphic arts window faded in) see: On the left side of the status line the name of the open plan is always faded in:

image5_32

Announcement of the open plan in the status line

Single plans from field of work remove

They can extinguish single plans again from the field of work, namely with the help of the dialogue Verwalten|Pläne|Löschen. The suitable plans are removed merely from the Workfile, besides, the real plan files at her central memory place are not touched.

Field of work empty, changes reject.

1. Click the cross on the right in the tool bar. image5_33

2. Moskito removes all plans which were not changed, without further inquiry.

3. For changed plans appears the query whether the changes can be rejected:

image5_34

Changes cannot be stored by the easy user! As soon as the plan is closed, the changes automatically go to ruin. Answer the dialogue box with Yes, all changes are lost. With no the plan from the Workfile is not removed, and the changes are preserved for your next meeting. If you liked to store changed plans constantly in the central plan continuance, turn please to your system administrator. (This concerns data belonging to customer; changes in the demo data are not storable.)